Home / Materials
Engineering file

Materials: specification and feasibility

Concept stage. No Stratum test data: specification targets and published literature.

Structure

Steel: grades and connections

Module frames are hollow structural sections (HSS) with plate gussets and bolted corner connectors. Grade choices follow AISC practice.

ElementSpecificationFy / Fu (min.)Notes
Columns, rails (rectangular HSS)ASTM A500 Gr. C50 / 62 ksiAISC’s preferred rectangular HSS grade. Round A500 Gr. C is lower (46 ksi yield); do not mix the two in calculations. AISC
Floor and roof beams (W shapes)ASTM A99250 / 65 ksiHigher minimum tensile than A500 Gr. C; yield governs most member design.
Alternative HSSASTM A1085 Gr. A50 / 65 ksiTighter wall-thickness and mass tolerances than A500; AISC expects it to supersede A500 over time. Availability and cost to be checked per supplier.
Gussets, base and connector platesASTM A572 Gr. 50 (A36 where unstressed)50 / 65 ksi (A36: 36 / 58 ksi)Weld-compatible with A500 and A992 under AWS D1.1 procedures.
Corner and inter-module boltsASTM F3125 Gr. A325120 ksi tensilePretension per RCSC. Located so every bolt is reachable from inside the module.
Foundation anchor rodsASTM F1554 Gr. 5555 ksi yieldCast-in; grout under base plate after leveling.
Corrosion protectionHot-dip galvanizing (ASTM A123) or duplex paint systemn/aFrame is inside the thermal envelope except at base plates and exposed connectors; those get the heavier system.

Open on steel: the connection reviews we relied on test local joint behavior under gravity and seismic loads, but the effect of different inter-module connections on global lateral stability of a stacked building “needs more investigation” (LJMU review). Single-story and two-story residential is the lower-risk end of that gap. We have not run any physical connection tests.

Mass and floors

Concrete: mix, reinforcement and weight

Floors, the wet-wall core and shear keys are precast. The weight of that concrete, not its strength, is the main feasibility question for a transportable module.

PropertySpecification / methodTargetNotes
Compressive strengthASTM C39 cylinders per batchf′c ≥ 5,000 psi at 28 daysTypical precast range. Design to ACI 318 and PCI MNL-120.
ReinforcementASTM A615 Gr. 60 (A706 where welded)Fy 60 ksiEpoxy or galvanized bar at exposed edges.
Sleeve and key groutNon-shrink cementitious, ASTM C1107Per manufacturer, verified by C109 cubesUsed in grouted sleeve splices. Pour temperature limits apply on site.
Fire resistanceASTM E119 assembly testRating by thickness and aggregate typeE119 heat-transmission end point: unexposed face rises 250 °F average or 325 °F at one point. PCI fire overview
TolerancesPCI MNL-135Per elementGoverns how floor panels fit the steel frame.

Module weight check (our estimate, not a test)

A 16 ft × 30 ft module is 480 sq ft. Normal-weight concrete is about 150 lb/ft³, so a solid 4 in floor slab is 50 lb/ft², or 24,000 lb before the steel frame, core, glazing, panels and finishes. Lightweight aggregate concrete (about 110 lb/ft³) would bring the same slab to about 17,600 lb. Our drawing shows an 8.4 in slab; a hollow-core or topped-plank section is the likely way to hold the weight down.

Floor optionWeight, 480 sq ftConsequence
4 in solid, normal weight≈ 24,000 lbFloor alone is 12 tons. Heavy-haul permit and a large mobile crane for the set.
4 in solid, lightweight≈ 17,600 lbAbout 27% lighter; costs more per yard and has different shrinkage and fire properties.
Steel deck with 3 in toppingto be calculatedLikely the lightest concrete floor; composite design to AISC 360 and ACI 318 required.

Width is the other transport limit: a federally legal load is 102 in wide, so a 16 ft module moves on an oversize permit and the rules vary by state. Sixteen feet is a common modular width and it adds cost.

Envelope

Glass: standards and performance targets

Insulating glass units are glazed into thermally broken frames in the factory. We have not selected a glazing supplier, so these are targets and standards, not certified values.

RequirementStandardHow it is verified
Insulating glass unitsASTM E2190Manufacturer certification and unit testing
Heat-treated or tempered litesASTM C1048Mill and fabricator certificates
Wind and snow load resistanceASTM E1300Calculation per lite size and design pressure; state design wind speed governs
Whole-window U-factor and SHGCNFRC 100 / 200NFRC-rated product label; compared against the state energy code climate-zone table
Windborne debris zonesASTM E1886 / E1996Required only in wind-borne-debris regions; laminated glass option
Cladding

Finish panels: where each one can fail

FinishMaterial standardMain limitationWhere to be careful
Weathering steelASTM A606 Type 4 / A588Patina only forms with wet–dry cycles; run-off stains adjacent concrete and soilCoastal and de-icing salt areas, continuously wet or shaded walls. ASTM G101 warns corrosion can be much higher when steel stays wet or is salt-contaminated. G101
Board-formed GFRCPCI MNL-128 (recommended practice)Panel weight and anchorage design; surface crazing and efflorescence if curing is poorFreeze–thaw states: specify air entrainment and sealer
Zinc standing seamPre-weathered rolled zinc (EN 988)Labor-heavy install; dents; contact with copper or treated lumber run-offNeeds a ventilated cavity behind it
Terrazzo / cement panelPrecast per PCIHeaviest of the six per sq ft; edge chippingTransport and anchorage loads
Ceramic rainscreenExtruded terracotta, EN 14411 / ASTM C1088 familyBrittle; clips and rails are the real structural systemImpact zones; hail
Brushed aluminumASTM B221 6063-T5, anodized (AAMA 611)Dents easily; high embodied energy; galvanic contact with steelIsolate from steel fasteners

Thermal bridging matters more than the finish does. For steel framing, nominal cavity insulation overstates performance: one ASHRAE-based figure puts R-19 batts in 2×6 steel studs at 16 in. on center at an effective R-7.1 (Building Enclosure). Continuous exterior insulation is the usual fix, and clips or girts that bypass it break continuity. This is why the rail system must be thermally broken, and why we have to model it before claiming any wall R-value.

Evidence

Studies

SourceFindingLimits for us
McKinsey (2019), Modular construction: from projects to productsModular projects have cut schedules by 20–50%. Cost savings are “the exception rather than the norm”; operators optimizing for scale could reach more than 20%. Costs can rise by up to 10% if logistics and materials outweigh labor savings.Mostly multi-unit and commercial. Savings depend on repeating a few designs, which a four-model product line is built around, but it is unproven for single homes.
LJMU life-cycle assessment of modular steel social housing (UK)91.3 tCO₂e over 50 years; embodied (A1–A3) 38.2%, operational energy and water 48.1%; 366 kgCO₂e/m² (A1–A5), comparable to high-performing CLT buildings. Low-carbon concrete, bio-based insulation and steel optimization could cut upfront emissions by roughly 8–10%.Light-gauge steel, not HSS frame plus precast floors. Our heavier mix will probably carry more embodied carbon; no conventional-build control in the study.
MDPI Buildings 13(7) 1727, review of inter-module connectionsClassifies connections as bolted, grouted, self-locking and tie-rod types and compares their mechanical behavior.Reviews lab tests, mostly on steel modules. Grouted sleeves into precast concrete are less covered.
LJMU review of structural elements in modular steel buildingsLocal connection performance is well studied; effect on global lateral stability is not.The same gap noted under steel above.
FHWA weathering-steel research (bridges)Uses the ASTM G101 composition index to compare weathering steel with plain carbon steel.Bridges, not thin cladding sheet; patina behavior at small thickness differs. We found no stabilization data for A606 Type 4 specifically.
Inspection

Pre-shipment checks

ItemCheckRecord
SteelMill test report per heat checked against A500/A992/A572 chemistry and strengthHeat numbers traced to each member
WeldsAWS D1.1 qualified procedures; 100% visual; MT or UT on sampled critical jointsWeld map per module
BoltsLot certificates; pretension verified per RCSCTorque log at set
ConcreteCylinders (C39) per pour; grout cubes (C109); cover and rebar placement before pourBatch tickets and break results
GlazingNFRC label, IGU certification, air and water test on a sample per lotUnit serials
DimensionsFrame squareness and length against the ±1.5 mm shop target (a target, not a measured capability)Survey sheet before panels go on
ModuleWater test and blower-door test before shippingTest report with state data plate
Open questions

What would stop this working

  • Weight. The concrete floor decides transport permits and crane size. Floor system selection and a full module weight takeoff come first.
  • Embodied carbon. HSS plus precast concrete is a heavier carbon profile than the light-gauge steel studied by LJMU. We need our own LCA before making any carbon claim.
  • Thermal performance. No whole-wall R-value exists for the rail-and-panel system. It needs a two- or three-dimensional thermal model and, later, a guarded hot-box test.
  • Connection testing. Grouted sleeves and bolted corner plates at module scale, under cyclic load, have not been tested by us.
  • Cost. Steel and precast are not cheaper per pound than lumber. Any cost advantage has to come from labor, schedule and waste, and McKinsey’s range includes a 10% cost increase.
  • Code path. Each state’s modular program decides the inspection and approval route for a non-wood system; see Areas served.

Request a quote.

Get a Quote