Home / Areas Served / Washington
Washington · WA

Steel & concrete modular homes in Washington

Modular homes are built to state and local building codes and set on a permanent foundation. Here is what applies in Washington.

Washington program

Administering agency
WA Dept. of Labor & Industries (L&I), Factory Assembled Structures program
Program / authority
RCW 43.22; WAC 296-150F (Factory-Built Housing and Commercial Structures)
Code basis
Not verified. Confirm with the local building department.
Inspection & seal
Building must have an L&I insignia before shipping from the factory; plans must be approved, and licensed professionals can now review plans.
Good to know
Wildland-Urban Interface code compliance required for modular structures since March 15, 2024; local departments decide where they may be sited.
Official source
https://lni.wa.gov/licensing-permits/manufactured-modular-mobile-structures/laws-rules

Summarised from public sources; rules change. Confirm with Washington’s agency and your local building department before ordering.

Your project in Washington

Step 1

Confirm zoning & permits

Local jurisdiction sets lot, setback and design rules. See Permits & Zoning.

Step 2

Plans reviewed to state code

We stamp plans for the code that applies in Washington.

Step 3

Factory build & inspection

Third-party or state inspection happens in the factory, then final on site.

Step 4

Set, connect, certify

Modules crane in, joints are torqued and inspected, and local sign-off issues the CO.

Quote a Washington home